Tecnovia Madeira completes construction of new Repsol fuel station in Cancela

Tecnovia Madeira has completed the construction of the new Repsol fuel station in Cancela, located in the municipality of Santa Cruz, Autonomous Region of Madeira. The project, developed by the Cassianos Group, was completed in approximately 10 months and was inaugurated on December 9, 2024.

The inauguration ceremony was attended by several prominent figures, including the President of the Regional Government of Madeira, Miguel Albuquerque, the founder of Tecnovia, José Guilherme Jorge da Costa, and the Administrator of Tecnovia Madeira, Marco Nóbrega.

Project Details

Tecnovia Madeira contributed to the completion of this project in all phases:

Initial Phase: Site Preparation

  • Removal of a stone outcrop covering an area of approximately 1235 m².
  • Leveling the ground, excavation, positioning, and backfilling of the fuel tanks.

Structural Phase: Construction and Foundations

  • Construction of the support building, which includes a convenience store and a pizzeria from the well-known Mr. Pizza chain.
  • Execution of foundations for the fueling islands and the price display monolith.

Technical Specializations and Infrastructure

  • Waterproofing of the roofs of the support building.
  • Construction of external infrastructure networks, such as drainage systems, water supply systems, irrigation systems, and electrical and telecommunications conduits.
  • Internal piping for wastewater, stormwater, and potable water.

Paving and External Works

The pavements and outdoor spaces were executed with attention to detail and include:

  • Asphalt mix pavement for vehicle circulation on the fueling islands.
  • Prefabricated permeable Pavê pavement on the walkways and parking areas of the fuel station and Mr. Pizza.
  • Rigid reinforced concrete pavements on the fueling islands.
  • Prefabricated curbs for the transition between pavements.
  • Landscaping with topsoil.
  • Painting for horizontal signage and installation of vertical signage.

A Milestone for Local Infrastructure

The inauguration of this fuel station in the parish of Caniço represents an important milestone for the region. Projects like this create jobs and contribute to the strengthening of economic growth, while simultaneously improving the well-being of the populations of Madeira and Porto Santo.

 

We grow by doing.

11.12.2024