Câmara de Lobos WWTP

Type of Work

Hydraulic Works

Environmental

Special Projects

Construction Company

Tecnovia Madeira

Location of Work

Câmara de Lobos, Autonomous Region of Madeira

Description of Work

Full Designation: Construction of the Câmara de Lobos WWTP

Client: ARM – Águas e Resíduos da Madeira, S.A.

Value of the work: €6 288 000.00

Begun on 18.07.2016 and inaugurated on 03.02.2017, the new ETAR in Câmara de Lobos increased waste water treatment capacity in the municipality, ensuring compliance with the applicable community directive.

Civil engineering

• Construction of new building

• Earthmoving

• Construction of structural elements in reinforced concrete

• Assembly and instalment of Metalwork

• Application of special coatings – waterproofing paint

• Assembly of electro-mechanical equipment and other accessories

• Demolition of existing building

• Installation of connections and complementary networks

• Civil engineering work associated with complementary EE

• Construction of submarine Outfall

• Construction of protection slope

Equipment

• Electro-mechanical equipment for the treatment lines and lifting stations

Electricity

• Electrical installations and instrumentation for the WWTP and accessory facilities

• Earthmoving – Excavations and landfills to make the working platform;

• Manufacture of structural elements in reinforced concrete – steel framework and subsequent concreting

• Assembly and instalment of Metalwork

• Application of special coatings – waterproofing paints

• Assembly of electro-mechanical equipment and other accessories

Maritime work

• Building of provisional construction spur

• Earthmoving

• Laying of tubes in submerged trench, creation of protection for the trench

• Removal of the provisional construction spur

• Construction of section of the outfall by sea

• Construction and placing of submerging masses on the Outfall

• Transportation and submergence of the Outfall, including the diffuser

• Placing of masses for stability and for protection of the external rockfill

Carrying out of the associated Coastal Protection Work

• Removal of materials and cleaning of sea floor

• Execution of core, underlayer and resistent coat

• Creation of antifer-type protection blocks in cement and their respective protection layer

Related Projects